Proposed 2013 El Diente Peak (Kilpacker Basin) Trail Reconstruction Project Flyover Video
by admin | Sep 27, 2012 | Videos detail gallery
httpv://youtube/Ajlvizb5VLI2012 San Luis Peak Project Flyover
by admin | Sep 27, 2012 | Videos detail gallery
httpv://youtu.be/hvgeJHclcl4North Maroon Peak Project Flyover
by admin | Sep 27, 2012 | Videos detail gallery
httpv://youtu.be/Z5PRfPG9shUMount of the Holy Cross Project Flyover
by admin | Aug 9, 2012 | Videos detail gallery
httpv://youtu.be/AmiRr45oS30How and Why CFI Protects the Fourteeners
by admin | Aug 9, 2012 | Videos detail gallery
httpv://youtu.be/95eL0WOZuRkRecent Posts
Facebook Feed
3 days ago
2 weeks ago
We have one open trail crew position for a fixed-site project on upper Mount Shavano this summer—and we need to fill it pronto.![]()
The work schedule is eight days on, six days off. Work days are 10 hours long and require a three-mile, 3,000-foot-elevation-gain hike. The technical nature of this project means applicants should have multiple years of experience in rock work, full bench construction, trail restoration, rigging and grip hoist operation, and familiarity with working in steep, technical terrain. Pay is $20-$24/hour.![]()
👉 Send your résumé to hiring@14ers.org ASAP.
... See MoreSee Less
3 weeks ago
⛏️ Two trail crew spots just opened up for a fixed-site project on Mount Shavano this summer — and we need to fill them fast. Think you have what it takes to build and maintain trails at 14,000 feet?![]()
The mid-mountain crew, known as the Mid Shavano crew, will tackle a daily hike of up to three miles with roughly 3,000 feet of elevation gain. Approximately 25 percent of the crew's time will be focused on finishing the restoration of the old trail at an elevation of around 13,500 feet. The other 75 percent of the season will be spent completing deferred maintenance on the existing trail, including constructing rock structures. This project will require a wide range of different trail construction and restoration techniques; as such, two or more seasons of trail work experience are preferred.![]()
The work schedule is eight days on, six days off. Work days are 10 hours long. The technical nature of this project means applicants should have multiple years of experience in rock work, full bench construction, trail restoration, rigging and grip hoist operation, and familiarity with working in steep, technical terrain.![]()
👉 Send your résumé to hiring@14ers.org ASAP.
... See MoreSee Less
4 weeks ago
Last week, CFI's 2026 seasonal crew headed up Mt. Elbert — Colorado's highest peak — for hands-on training. Rock steps, backwall, and views that don't quit. This is what it looks like to learn the craft at 14,000 feet. ⛏️🏔️![]()
#Colorado14ers #TrailCrew #CFI #MtElbert #TrailBuilding![]()
🎥 Miriam Venman-Clay
... See MoreSee Less